AV在线免费不卡可看_亚洲中文一本无码av在线无码_免费完整av片在线播放_另类亚洲图区在线视频

Home > Service details
Service details
Operation and Routine Maintenance of Xinjiang Alataw Mountain Pass Metering Station
Zhong Hai Lin   |   2019-12-19   |   Views:2190

Sino Kazakhstan crude oil pipeline is the first transnational crude oil pipeline in China. Phase I is from Atasu of Kazakhstan to the Alataw Mountain Pass of Xinjiang, China. The total length of phase I is 965.1km, 962.9km in Kazakhstan and 2.2km in China.The Alataw Mountain Pass crude oil first station, located at the Alataw Mountain Pass port, is the first international crude oil pipeline in China-the “l(fā)eading station” of the domestic section of Sino-Kazakhstan Oil Pipeline.The main function of this station is to receive the oil from the upstream pipeline. The oil from the upstream pipeline goes through the commercial trade transfer from the metering terminal station adjacent to Kazakhstan. After being pressurized by open side connection,it will go through  Dushanzi-Urumqi-Shanshan-Lanzhou-Sichuan Pengzhou crude oil pipeline, and the station will provide resources for many downstream large-scale petroleum and petrochemical enterprises.