The tunnel is 460.6m long and its inner diameter is 2.4m. The crossing geologies of the tunnel are full -section large-size pebbles. After the tunnel is perforated, a natural gas pipeline with a diameter of 813 mm and a product oil pipeline with a diameter of 406 mm will be laid.
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
東非原油管道項目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project