該項(xiàng)目管道起點(diǎn)為集聚區(qū)舟山LNG首站,途徑岱山縣秀山島和定海區(qū)長(zhǎng)白島,終點(diǎn)為定海區(qū)馬目分輸站,由4段陸域管道和3段海底管道組成,陸上管道總長(zhǎng)度約19公里。本次審批項(xiàng)目為集聚區(qū)段,管道總長(zhǎng)1077米,均為地下市政管道。工程主體為DN1016mm管徑天然氣鋼管,設(shè)計(jì)壓力9.9MPa,起點(diǎn)位于經(jīng)十一路與緯八道交叉口,沿經(jīng)十一路向北在離海塘約65米處向西橫穿經(jīng)十一路,向西約500米后向北穿越海塘。
本項(xiàng)目的建設(shè)對(duì)于實(shí)現(xiàn)舟山液化天然氣(LNG)接收站與浙江省天然氣管道互聯(lián)互通具有重要作用。
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
東非原油管道項(xiàng)目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project