項(xiàng)目概況及總體要求山西、陜西等地的壓裂返排液及生產(chǎn)水處理裝置(撬裝設(shè)備)需要在天津進(jìn)行集成安裝(成撬),成撬后的設(shè)備及部分未成撬設(shè)備及輔材等拉運(yùn)至現(xiàn)場(chǎng)后需要進(jìn)行現(xiàn)場(chǎng)安裝,安裝好的撬裝設(shè)備投入生產(chǎn)運(yùn)營(yíng)后,需要對(duì)其范圍內(nèi)的設(shè)備、設(shè)施、系統(tǒng)及其配套附屬設(shè)備設(shè)施進(jìn)行維保工作,同時(shí)安排人員負(fù)責(zé)水處理撬裝設(shè)備對(duì)返排液及生產(chǎn)水的有效處理及穩(wěn)定運(yùn)行,以保證生產(chǎn)安全平穩(wěn)運(yùn)行。
Iraq Natural Gas Processing Plant Project
Iraq Graf Project
Iraq Halfaya Oilfield Well Site Power Supply Project
Oil depot project in Nasiriyah, Iraq
Steelmaking and Continuous Casting Project In Iran
Iraq Early Power Station Trial Operation and Operation Support Project
Commissioning and Operation Support of Iran’s North Azadegan
東非原油管道項(xiàng)目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project